C.R.E. No. 24.
Kowloon Canton Railway.
BRITISH SECTION
ESTIMATE.
Main Head. VIII.
Sub. Head b. Station Machinery, Shatin
DESCRIPTION Quantity Unit Rate AMOUNT ONE STATION Weighing Machine (Platform) 1 No. 3,000.00 3,000.00 Beach Block 8 No. 100.00 800.00 Buffer stop 2 No. 550.00 1,100.00 Total 4,900.00 Contingencies 10% 490.00 Grand Total 5,390.00 Total for one Station 4,900.00 And for two stations 9,800.00The original text appears to be an estimate for station machinery for the Kowloon Canton Railway British Section, specifically for Shatin station. The table has been reconstructed for clarity.
was removed as per rule 12 and other formatting was done according to the rules. Here is the revised response:C.R.E. No. 24.
Kowloon Canton Railway.
BRITISH SECTION
ESTIMATE.
Main Head. VIII.
Sub. Head b. Station Machinery, Shatin
DESCRIPTION Quantity Unit Rate AMOUNT ONE STATION Weighing Machine (Platform) 1 No. 3,000.00 3,000.00 Beach Block 8 No. 100.00 800.00 Buffer stop 2 No. 550.00 1,100.00 Total 4,900.00 Contingencies 10% 490.00 Grand Total 5,390.00 Total for one Station 4,900.00 And for two stations 9,800.002 a $ 3
00
24.
GEI
And noolwor
C.R.E. No. 24.
HOITO32 HAITIsia ›
3TAMIT23
D
kowloon Canton Railway.
133
BRITISH SECTION
ESTIMATE.
Main Head.
VIII.
Sub. Head
b. Stagion Machinery,
Shatin
Work
quantity.
AMOUNT.
DESCRIPTION.
Rate.
Unit.
ONE STATION
Weighing Machine (Platform)
Beotch Block
του
Buffer sto).
Bienal a
Total
IBIOT
Cts.
Total for one Station
And for two zote.
8 8
100
1.550
00
8 8 8 8 2 8
3,060 00
201 zaloniani:not
IstoT ba
Contingincies 10%
Grand Total
4,500
00
489 00
8
✓
5,049 00